Ok end of day update

Cupra r rack held up in position and bolt in


034 Solid subframe bushes ready to install

Bushes and 25mm h&r arb installed

Then it came to bolting the subframe in position, jacked it up and started all the bolts, i then found that the steering rack would go in position as the arb was in the way so abit of messing detaching the arb then bolt the rack in place then again bolting the arb in place
i then bolted the subframe up pulling it forward as much as possible to give as much caster as possible.

Then installed the new febi bearings and powerflex top mounts to the weitecs


Hubs and coilovers installed with new febi ball joints


S3 drop links and tie rod ends attached

Also decided to install the eibach rear anti roll bar

Then attached the downpipe
And the newly polybushed dogbone mount

I then attached the backbox but am having to wait to install the rest of the system as i am awaiting the arrival of some more exhaust clamps!

And finally i installed the temporary 312mm brake setup i had in the shed until i can order some cupra r brembos


That's it for today and back at work till mid next week so glad i managed to get quite a bit done

Just need to finish installing the exhaust and bleed the brakes and then i can wack the wheels on and drop her on the ground and then tighten a few bolts (hubnuts, top mounts) and then when my ecus come back from r-tech install the mapped ecu and get her started so i can bleed the power steering.
got a few more bits coming i have ordered but i think the next job may be relocating the battery but we will see what happens