So you get the idea of what I'm rambling on about

I have shamelessly stolen some photos from various threads. Sorry if I've stolen your picks!
This is the ASN way of doing it. 90 deg from the FMIC and 76 hosing which is reduced as late as possible.

Then the forge/SCN way of doing it with 45 deg from FMIC again reduced as late as possible but this time with hard pipes.

Then reduced from the FMIC with 45deg piping and 63mm piping the rest of the way

Then hard piping reduced from 76mm to 63 mm straight from the FMIC.

Like I said lots of different ways of doing the same thing! Have a look through the threads and see which way is best for you!