So, I've had a busy couple of days!
Got back from holiday at 5.30am Monday morning, up again at 9.30 to go and visit Matt at OCD (new forum sponsor - see
here).
Matt offered me a great deal on air at the start of the month so I ordered it and this week was set aside to fit it!
The setup I went for was the following:
-Autopilot V2 Management
-4 Gallon Pancake Tank
- Viair 444c Compressor
- Slam Series XL Front Bags
- Firestone Rear Bags
- 3/8" Lines
So by the end of the day Monday all the wiring was complete, lines were ran and a floor was cut for the spare wheel well. Tuesday morning chassis notch was done, bags were fitted and tank/compressor/manifold were temporarily bolted down leaving it looking like this:





The arches need to be rolled as they are sitting on the tyres with 10psi still in each corner, when that is done it should be sitting a lot better.
I then got cracking with the boot build which I will update later!