you'll need a 2ft spirit level 
Dont laugh Alex this little discovery has set me back a few quid that could have gone on the new boiler system

The tapered chimney looks like only two bricks need replacing, but the smaller one needs taking down to the lead flash and rebuilding, because another cold winter will only split the bricks even worse.
Notice how the pointing on the tapered one has probably preserved the bricks through the weather/time.
Agreed.
I took down and rebuilt a 5 ft brick pillar last summer. It's easy once you get the hand of it.
Its all about time to me Jon I've not used cement and bricks before :embarassed: if it was on ground level I would have a go, but the cost of scafolding these days its not cheap rather have someone just take out the bad courses and cap it over.
The fire place is not being used plus if I wanted full tile replacement it would mean more money and noone can see that side of the house.
Anyone near who can do such a job? the scafolding will be inplace before anyone comes I need to plan it now or come winter I fear the worst TBH.
