Haven't updated this for some time.... so I will skip to the good pictures...
OK, ordered a radiator to make brackets up too and had a trial fit...

New inner panels fabbed up and spot welded in place to look orginal.

Upper leg fabbed up and welded in to get rid of all the rotten parts

This was the start of today 15/10/2011 - had a heavy night the previous night so not feeling the greatest!

Jake as usual doing all the hard work


Just getting is all down to bare metal ready for primer.

Primer finally hitting the bodywork - yes there is more welding up front to be done but I wanted to get it in primer to stop the clean metal getting rusty.



And thats it for a bit. Going to line up an engine and box to see if everything fits ok with the trans tunnel how it currently is next.
Then will continue welding the rest of the car up and make it again into a rolling shell to dissappear for a month to have the cage fitted. I'd love to start getting bits powder coated but with all the work that needs to be done it would need doing again after.
Dan