Mine is finally in transit, as of this morning (checked tracker 11pm last night and was “in build”, checked this morning at 6am and it has changed). If it didn’t change over at midnight following actual status change earlier in the day, then it would appear that the tracker updated in real time and my car would’ve been built Sun to Mon over the 30 hour construction time. In that case it was a full 2 weeks late – not looking good for those expecting theirs to be built on their actual stated build week.