Right, just thought i would write abit about whats happening and whats been brought so far.
New Parts.

Both Side Front control arms(I`ve also uprated them)
B/S/F Ball joints.
B/S/F Wheel bearings.
B/S/F Hubs.
B/S/F Top strut mounts.
Both track rod ends.
Both steering rack gators.
B/S/F Brake calipers.
Mintex Cmax Disc's and pads alround(rear disc conversion).
Both rear calipers.
B/S/R Wheel bearings.
Scirrocco 16v handbrake cables.
Goodridge braided brake pipes.
Polyurethane bushes everywhere.
Fuel filler neck(Covered in stone chip to stop the rot).
Fuel cap.
Fuel tank.
Front and back bumpers.
And a few side strips replaced.
And there will be a load of parts that i have forgot and a load to still get.
Some of the work done so far.
Brake pipes replaced and getting routed through the car with the edition of a hydraulic handbrake.Back axle has been removed,cleaned and hammerited.Underneath has been cleaned up and under sealed.The gear change has been stripped,cleaned,painted and re-bushed.
Heres some photos of so far.

                       ÂÂÂ

                       ÂÂÂ

                        ÂÂÂ

                        ÂÂÂ

 ÂÂÂ
Did you notice the garage has been cleaned out and painted as well,bonus.                      ÂÂÂ