Author Topic: How long does it take to do an engine swap?  (Read 2919 times)

Offline Mitching

  • Here all the time
  • ****
  • Posts: 489
Re: How long does it take to do an engine swap?
« Reply #10 on: 14 December 2010, 22:24 »
Don't do a like for like FFS - get a 2.0 in there, you goon.

This is an opportunity not to be missed!

You will not regret it.
One day DH, one day.
But seeing as I'm only 20 and a student with no NCB, funds are limited and I'm already paying loads for insurance with an 8v.
One day when I got more money for a daily I'll get a project going, don't you worry  :wink:

Offline Ben Lessani

  • I live here
  • *****
  • Posts: 3,873
  • The poor mans MK2 Haynes author
Re: How long does it take to do an engine swap?
« Reply #11 on: 15 December 2010, 13:33 »
Its pretty easy (rusty/rounded bits ignored).

It took me about 2 hrs to remove the old engine, and about 8 hrs to remove the manual rack, install the PAS rack, drop the engine+box in. Granted, I was on my own, in the middle of winter.

With 2 people, you could get away with doing it in 2-5 hrs.


Tools Required: 8mm XYZ Key, 17mm Sump Key, Jack, Axel Stands, Full Socket and Spanner Set, Engine Crane



...

linky http://www.golfgtiforum.co.uk/index.php?topic=49436.msg576761#msg576761