
I am glad to say i am half way there to getting the valver back to glory.
story so far....sat on the garden for 6 months could of sold 10 times over but hen the missus had a change of heart!!!!

jobs done so far....new electric window(drivers), new fuel pump/filter(thx for the help), new brakes all round and calipers on back!, new fuel pipe on pump, new bearings on back, oil change and plugs re-wires vdo clocks and dash,secoundhand back shelf and mot'ed.
jobs to do.....front engine mount, cam belt, 2xfront shocks, gear selector bushes,2xdoor cards, oringal gear nob/gauiter&handbrake.ect..and bbs front valence(rare) paint job,refurb alloys, vdo clock holder for ashtray.

last feb!!!