I paid £50 for the work, cash. Took them half hour as it is the setup that takes the time. Tyres must be off though.
did they re machine the lead in?
Still things take longer and cost more dan sarf

You can do some wheels with the tyres on, if your machine is big enough, i have done S1 RS turbo wheels with rubber on but never D90s so ill shut it
