Got my AUQ engine today along with the 6 speed box, all looms, ECU, intercooler, all pipework, gear linkages, DBW pedal, downpipe with CAT, Ko3s
will prob see craig about a map for it as it needs some codes patching out.
My dad will be pleased with the upgrade in performance over that horrible 2.slow 8v (these are the worst ever engine in a mk4!!!!)
the forge pipe needed to relocate is all over the net!! google it!
you need to know the size of your pipework, theirs 2 sizes available
http://www.forgemotorsport.co.uk/content.asp?inc=product&cat=&product=FMMAPT