A few updates.
Well I did nothing at all over christmas time apart from eat and drink to much! Now its all over its time to get back to work.
The flanges I ordered from ebay never arrived so I got my money back and order some more and they came today so started finishing the elbow and tacking together the downpipe. I also started cutting up and re-welding the 3" subaru exhaust so it will fit.


Will sort out the backbox and getting over the rear axle once ive finished the down pipe and got some spacers so I can get my wheels to fit over the brembos and finally drop the front end.
Tacked together the downpipe and checked to make sure it fits, its tight but should be ok if I heat wrap it.


From underneath

Next will weld the flanges so I can join the downpipe to the flexi and rest of the exhaust.
I also fitted the HKS boost controller in the bay. Will cap off there the N75 was on the TIP as it will be all running through the HKS system. Should have really looked at it before as I didnt have to weld on pipes for the puck and now the N75, nevermind.


Then started on the wiring for the meth injection and the boost controller its ready to be soldered.

Ran into a problem now as I have to splice the wires by the ecu to get the rpm and throttle position sensor. I have a agu wiring diagram but still have no idea which is which, if any can help it would be appreciated got to work it out ready for the wkend.