Some pictures of recent work :
engine bay stripped and cleaned

Interior stripped out. old looms removed for modification to the new looms

AGU Loom / ECU modified at the ready

Golf MK2 16v 160 MPH Clocks modified to accept the loom

Custom engine mounts

In the Engine goes






Also :Picked up the G60 brake set up

Next up is more wiring...