1PM saturday: started building the engine
new intermediate shaft bearings:


new mainbearings:

crank with new bolts:

crank, new pistonsrings, new conrodbearings:


new seals:

reinz headgasket:

cylinderhead, polished valves, valves seats are done, valveguides replaced

cylinderhead fitted:


oilpump and windagetray:

at this point:


detailshot:
