

Engine bay is also being de seamed & smoothed not a quick job at all.
Well next up was to mock fit the engine in the engine bay to see where we will placing hiding wires pipes & so on, this was very quick so didn't manage to to take many pic's but when the engine is fitted again I will make shore more pic's are taken.

Engine box & mounts bolted to geather & going in.

drive shafts going in

left is S3 & right is mk3, it looks a lot longer than the mk3 one
Now I wanted to quickly connect the loom up out side of the car so the car so that I could test a few things.
Engine loom bing connected to the Ecu




Steering column & speed connected with ignition on, oh what a surprise there are warning lights

Air bag light is on but the there is no air bag loom connected in the whole system

