I know i know, how longs a piece of string, but on average how long does a stage 1 re-map take?
Ive read posts abuot people leaving their cars and picking them up a week later, do they all take this long?
Dont get me wrong, i know its not a 5 minute job, but can it be done in a day assuming no faults are found?
Thanks