GolfGTIforum.co.uk
General => General discussion => Topic started by: jasonpi on 07 December 2005, 14:53
-
took me just under 2 hours including electrics pods sound proofing....pointless thread but im happy :smiley:
-
give me a screw driver and the 12mm spanned and i could get it out of their in under half an hour (bloody leaky doors :angry: )
probably and hour if you don't know what you are doing!
-
Mark 2 interior is my speciality
i have but that many in and out i have lost count.......hey that ryhmes! :grin:
-
take me about 3 mins with half a gallon of unleaded and a box of matches....... :evil:
-
take me about 3 mins with half a gallon of unleaded and a box of matches....... :evil:
im telling you, burning the vr6 won't make ot go faster, but it will lighten it :wink:
-
2hrs?!! amateur!! like mix i've done seats, door cards, centre console and A,B,C pillars in under half an hour. granted the electrics would be a pain in the ass!! :P
-
2hrs?!! amateur!! like mix i've done seats, door cards, centre console and A,B,C pillars in under half an hour. granted the electrics would be a pain in the ass!! :P
Now now... 2hrs is probably how long it'd take me!
But i've never stripped down any car before. Although im looking forward to it in the coming months, im very fussy about my interiors and so i can see me being disappointed with whats in the car i buy.. in which case out it comes!. I wonder if it'd be easier for me to just pay for a few pints and ship you and mix to manchester for a few hours to do it :P
-
deal!
-
Excellent! Good old British buisness - Beer should be legal tender. Then i'd be able to brew my money in the garden shed and wouldnth ave to put up with all the strange stares in the local staples copy shop.
-
there should be an annual strip a mk2 competiton :grin:
-
2hrs not bad when u count everything including electrics now that was a pain in the arse plus the two immobilisers that were on it must say though apart from the nearside rear quarter bodywork is mint will get some piccies up
-
there should be an annual strip a mk2 competiton :grin:
Is that an offer of your dub to be donated as the competion car?
-
2hrs?!! amateur!! like mix i've done seats, door cards, centre console and A,B,C pillars in under half an hour. granted the electrics would be a pain in the ass!! :P
Now now... 2hrs is probably how long it'd take me!
But i've never stripped down any car before. Although im looking forward to it in the coming months, im very fussy about my interiors and so i can see me being disappointed with whats in the car i buy.. in which case out it comes!. I wonder if it'd be easier for me to just pay for a few pints and ship you and mix to manchester for a few hours to do it :P
deal with me too!!!!
-
there should be an annual strip a mk2 competiton :grin:
Is that an offer of your dub to be donated as the competion car?
if you wanna replace the interior with a roll cage be my guest :smiley:
-
there should be an annual strip a mk2 competiton :grin:
Is that an offer of your dub to be donated as the competion car?
if you wanna replace the interior with a roll cage be my guest :smiley:
you need one :wink:
-
^^^ BURN! :grin:
-
its hard to keep a golf driver with shot suspension on its wheels :grin: :embarassed:
-
its hard to keep a f**ked valver with shot suspension and tyres out of a tree, i should know! :embarassed:
-
its hard to keep TWO golf driver with shot suspension on its wheels :grin: :embarassed:
-
:grin: only rolled one of them :tongue:
and it was a driver and a ryder so na na :laugh:
-
:laugh:
and tested the impact strength of the other one.... :wink: