OK will get a proper update soon, i promise lol. at work atm, so cant do it now lol.
anyway, got quite a bit done, since its now been actually started. Meaning i am actually doin stuff to the car now lol. i will just give a brief outline for now and get pics up, etc later.
- stripped down, pretty much all parts, subframe, wishbones, etc have been refurbed and hammerited black. got most of the polybushes on the parts.
- car is sanded down and ready to be sprayed matt black. engine bay is sprayed.
- 1.8t fitted with vr clutch and g60 lightened flywheel.
- sorted out flat tyre
- blew up 1.4 engine LOL!
- rebuilt gti rear beam.
hoping to get the car sprayed and all the subframe and brakes, etc all fitted by next week. then its rolling shell.
then after that all thats needed is fitting the engine/box, IC, ordering/fitting boost pipes, sorting out new 2.5" exhaust sytem and getting all the wiring sorted and making it all works as it should.
LL