I'll do a quick update then
The green machine is pretty much all back together now and ready for shipping off to Kells' mate, just got the gear linkage to fidlle with an thats done.
We are waiting on the cat to turn up from America and then thats pretty much everything we need to start putting F17BAD back together, gotta go grab some clips, hoses etc for the install but allthe major parts are just sat waiting. Im on with the fabrication of the pedal box as we spk, gonna install a new bracket to the box for the DBW pedal then spray it all up black to keep with the OEM feel. Ive a few more brackets to make for the bay, one for the relocation of the expansion tank and one for the relocation of the carbon filter, me and Kells didnt like the idea of venting the petrol fume line to atmosphere so the carbon canister stays.
Work starts Sunday on the proper install so expect lots and lots of pics and maybe even the odd vid of our progress
Im sure I will have left some bits out so il let Kells jump in on that.
EXCITING