Factory shut down is from BW29 to BW32 inclusive. So if mine had been build BW28 ie. the week before the shut down then yes it could have been shipped regardless of the shut down. But its been moved to the first week after the shut down, so a 4 week minimum delay ie. mid Sep. This is unfortunate as I obviously wanted it to be built earlier, but I'll take 33 as at least its confirmed now, and given the hassles I've had as have others 33 is as best a result as I could have hoped for!