Bec, feel free to move this if in the wrong place but seeing as its 100% focussed towards detailing I thought I'd post here:-
Thought I'd share this with you guys.
We broight the house a year ago and I've always been unhappy with the fact that I couldn't get around the cars whilst I had the doors shut etc, so last week we set to convertiong the two up and over doors to one sectional 5.5mtr door.
This is how the garage was when we got the house. A friend of mine does contract flooring so he did the floor before we moved in. I set it up with my newage cabinets and created a gym area. This never got used so I sold that and put towards the project.
My cabinets have been moved a few times and are now ion their final resting place.
First job was to remove the pillar and install a new steel.
We then got the loft boarded out, with lighting in the loft and power.
Then got the door fitted and walls painted
And the almost finished result:-
Jobs still to do:-
Plaster the ceiling (Saturday with 38mm insulated boards)
Have the floor repaired where the pillar was removed (TBC)
Internal/external lighting (Tuesday night)
Order and install a 2nd radiator
Then wait for the builders to finish the driveways, improve my drainage at the bottom of the drive (doesn't take snow foam away :lol:).